A reference from Harbauer Berlin GmbH. More references from Harbauer Berlin GmbH

Construction water treatment plant for the removal of suspended solids and oil

Stockholm

Ressources: Soil, Groundwater

Flow rate: 18 (m3/h)

Pollutants: Oil

Processes: Phase separation, Sedimentation

In operation since: Apr 2012

KF Company: Harbauer Berlin GmbH

723385 Stockholm

These two stages were each carried out redundantly. The entire process has been designed to be frost-proof. In the next process step, the two wastewater streams are combined into a flow measurement and sampling template. The water flow then reached the pump receiver via an overflow, where it was pumped out into the sewer system via two redundant quality pumps.

In order to ensure fully automatic and safe operation, Harbauer GmbH used remote monitoring via alarm computer and process visualization.

Download this reference as PDF
Contact person at Harbauer Berlin GmbH

Do you have any questions about our services. Then we look forward to your contact request!

Kai Ressel
Project Manager